Ideal location was beside the existing tank. Before this could begin machinery was required to remove overgrown bushes and the appropriate size pad prepared. 30,000g tank was installed alongside existing. Additional plumbing was required to connect into the current set up. Because of the location within the school grounds an additional safety feature of a ladder guard was also requested. The entire project from site preparation through to ladder guard installation was carried out by the GNT team all outside of school hours.